Five things are metered, and whether any of them resets depends on what the Project is running on.

The two cadences

A paid Projectresets each billing period

Posts, topics and images refill when the billing period rolls over. This is the cadence every plan uses.

A Free Projectlifetime, never resets

The Free grant is a one-time total for the life of the Project rather than an amount per period. It has no period start and no period end, and nothing refills it. Spending it is the end of it until the Project is upgraded.

MeterScopeResets on a paid planResets on Free
PostsPer ProjectEach periodNo
TopicsPer ProjectEach periodNo
ImagesPer ProjectEach periodNo
RevisionsPer postNoNot applicable, regeneration is off
CompetitorsPer ProjectNo, it is a standing limitNo, it is a standing limit

A Free Project's grant is 3 posts, 40 topics, 15 images and 7 competitors, with no AI article regenerations.

Where to see it

Settings, then Usage, for the active Project. Workspace usage shows each Project's usage side by side rather than adding them together.

At a limit

Production stops for that Project. Autopilot stops producing, and a manual generation request is refused with the reason rather than failing quietly.

On a paid plan it starts again when the period rolls over. On a Free Project it does not, because there is no period to roll over: upgrading the Project is what lifts the limit.

Nothing already produced is affected, and nothing is deleted. A Free Project that runs out of its posts or its images does start a lifecycle clock, though: 14 days later it is archived, and at 30 days its public blog stops being served. Upgrading before then cancels both. See what happens when a Free Project runs out.

The notice you will see

When a Project exhausts one of posts, topics, images or competitors, a notice appears at the top of the workspace naming the Project, listing the dimensions that are full, and saying that existing work is safe. It reads the current counters rather than a history of refusals, so raising the allowance or removing a tracked competitor makes it disappear on its own.

What it offers depends on what the Project is running on.

Running onWhat the notice says to doCan it be dismissed
The Free grantChoose a paid plan for this ProjectNo
A trialStart the chosen plan now, or wait for the trial to endNo
A paid planReview a higher plan, or wait for the next periodYes

If you cannot manage billing for the workspace, the notice says the same thing but asks you to speak to an owner or admin rather than offering a button that would refuse you.

Reservations

Work is reserved before it is done, which is why the counter can move before an article appears. A failed run releases its reservation instead of consuming the allowance for something that does not exist. See quotas and reservations.

Needing more

Change the plan on that Project, or put a plan on it if it is still on the Free grant. Either takes effect immediately, and neither costs you the work already in the Project. See changing a plan.